'l <br /> TABLE 4 <br /> 'i ~ Local Wastewater Systems Development Charge Analysis <br /> 1~ Amalysis of System Value <br /> T tal Replacement Cost -Pipe $241,250,150 <br /> T tal Replacement Cost -Pumping Stations ~ $32,267,813 <br /> <br /> V' lue of the River Road/Santa ClaraMighway 99 Area'System ($27,282,281) <br /> C cost of future projects within UGB $29,437,782 <br /> <br /> O her!Wastewater Com onents $11,550,000 <br /> T ~ tat Cost of Wastewater. System (total cosf of existing system) ~ 5287,223,464 <br /> 2.,i Anialysis of Assessable Amount <br /> Size Length (LF) X Cost (LF) = Total Cost <br /> 6-inch 76,630 X $54.63 = $4,186,412 <br /> 8 to 48-inch 2,387,fi50 X $55.18 = $131,740,976 <br /> se sable Construction Cost [ $4,186,412 + $131,740,976 j $135,927,388 <br /> se 'sable Cost for AdministratioNEngineering [ $135,927,388' .25 ] $33,981,847 <br /> taf ssessable Cost [ $135,927,388 ±$33,981,847 j $169,909,235 <br /> . Ca achy Information/calculations 4. Calculation of Wastewater SDC <br /> al apacity Residential Units 90,000 Non, Assessable Cost, $104,254,228 <br /> do ~f SF Units to Resident Units 64 % Cost peg EOU ~ <br /> _"t s4o4,2sa,22s _t 1~~.1. 5850.69 <br /> D ,nits [90,000 x 6496] 57600 Cost per Fixture. Unit ._;:_..[_$850.69 t 16 j '$53,17 <br /> D ttributable Flow 47 % Cost per square ft tot size. in RR/SC . ~ :=50.025 <br /> i S' stem Capacity (EDUs) (57,600 / .47] 122,553 Co§# for.historic consumption ~ - - <br /> y ic~l SFD average monthly winter water 6,000 ("g.cammercial devebpment only) $141.7.8 <br /> c ns m lion December - ri (gallons) - {.per 1,000 gailons~ $850.69 / 6 j - <br /> .Calculation or Reimbursement Percentage <br /> i S, stem Capacity (EDU's) 122,553 Units 100.00 percent <br /> isti ' g Use 66,000 Units 53.85 percent <br /> rce t Available for New Development 56,553 Units 46.15 percent <br /> tal alue of Reserve Capaaty (value of system) $44,193,816 100.00 percent <br /> lue'of Increased Capacity (cost of future projects in UGB-Master Plan) $29,437,782 66.61 percent <br /> lue,~of Reimbursable Capacity (previously paid value-existing users) $14,756,034 33.39 percent <br /> March 01, 1997 Methodologies: City of Eugene SDCs Page D-3 <br /> <br />