New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-97-02-F
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-97-02-F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 4:09:17 PM
Creation date
8/15/2008 11:04:26 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
SDC Methodology
Document_Date
4/30/1997
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
256
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br /> ~1~ <br /> ~i, 7.2.3 Previous Payment or Use <br /> I <br /> <br /> j In calwlating the credits given under this section, the City Engineer shall apply credit only <br /> to the developments for which the previous use or payment can be verified. Credit far <br /> previous use will be based on the last known verifiable use and the burden of proof is on <br /> the applicant to provide adequate documentation. <br /> ~I 7.2.3.1 Preexisting Development Credit <br /> ~I <br /> When an applicant for development of vacant land establishes that the land was <br /> previously improved with structure(s) which were demolished within 5 years of the <br /> application, a reduction for the demolished structure(s) shall be granted provided <br /> a reduction for the demolished structure(s) has not been previously given. <br /> <br /> i <br /> 7.2.4 City Cost of Construction Credit <br /> In calculating the credits given under section 7.2.1 and 7.2.2, the City Engineer shall <br /> estimate the cost of the capital improvement based upon what the City would pay were it <br /> to construct such improvements. <br /> 7.2.5 Revenue Collection for Equivalent Assessment or Special Benefit Credit <br /> When an equivalent assessment or a special benefit assessment is collected when <br /> <br /> ~ property connects to a public improvement for which the City has granted a credit under <br /> 7.2.2 (3) above, the revenue collected (net of the costs of collection) shall be deposited in <br /> the SDC fund for the system to which connection was made and for which the credit was <br /> given unless the SDC fund has been reimbursed for the credit from other City funds. If the <br /> SDC fund has been reimbursed in advance from other City funds, the revenue collected will <br /> be deposited to the City fund which reimbursed the SDC fund. <br /> 7.3 Revocation of Credit and Impact Reduction <br /> A credit or impact reduction which has been applied to reduce SDC fees may be revoked and the <br /> <br /> I. , unpaid portion of the SDC reimposed as a lien against the property, within the time required by <br /> these Methodologies, if: <br /> (1) The associated capital improvement for which SDC credit has been given is not constructed <br /> or completed as required, or fails to function as designed; or <br /> (2) The associated reduction program for which an impact reduction has been approved is not <br /> instituted or is modified without the approval of the City Engineer, or ceases to function as <br /> designed. <br /> Such revocation shall not occur until ten days prior written notice has been given to and an <br /> opportunity to be heard afforded the permittee and property owner. If the credit or impact <br /> reduction is revoked, the City Manager may add to the amount due, the cost of the revocation <br /> proceedings. <br /> I <br /> May 1, 1997 City of Eugene SDC Methodology Page 12 <br /> I <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.