l.~ N ~ <br /> SFD and Duplex Residential development: <br /> ~ 100% flat rate Stormwater SDC impact reduction for complete containment <br /> of all on-site stormwater, with no direct or indirect connection to the public <br /> system; or <br /> A 50% flat rate Stormwater SDC impact reduction for any amount of partial <br /> containment of runoff on-site. <br /> Multifamily Residential, Commercial, Industrial, other development using a common <br /> or shared facility: <br /> ~ The Stormwater SDC will be reduced in the same proportion that the <br /> mitigating facility reduces runoff leaving the fully-developed site. <br /> 7.2 Credits <br /> City approval of credits shall be given based on one or more of the following: <br /> 7.2.1 Qualified Public Improvement Credit <br /> For any qualified public improvement, as defined in Eugene Code, to be constructed in <br /> connection with the development, for which an SDC is collected. <br /> 7.2.2 Capital Improvement Credit <br /> For any capital improvement as defined in Eugene Code, to be constructed as part of a <br /> development to the extent: <br /> (a) that it reduces the need for construction of specific, identifiable public <br /> improvements; <br /> or <br /> (b) that it would otherwise have to be constructed or acquired at public expense and <br /> is eligible for funding with Systems Development Charge dollars ander the current <br /> policies of the City Council; <br /> or <br /> (c) that the City can recover credits through collection of an equivalent assessment <br /> from benefitted properties, or for which the City Council has formed a Local <br /> Improvement District in accordance with provisions in Eugene Code 8.610 (6) or <br /> 7.407 (3). • <br /> 7.2.3 Previous Payment or Use <br /> In calculating the credits given under this section, the City Manager or the Manager's <br /> designee shall apply credit only to the developments for which the previous use or payment <br /> can be verified. Credit for previous use will be based on the last known verifiable use and <br /> the burden of proof is on the applicant to provide adequate documentation. <br /> <br /> March 01, 1997 Methodologies: City of Eugene SOCs Page 12 <br /> <br />