<br /> ~r <br /> METHODOLOGIES: <br /> City of Eugene Systems Development Charges <br /> Appendix G <br /> March 01, 1997 <br /> .0 Formula and Calculation Details <br /> 1.1 GOneral Rate Setting, Cost of Service Formula: <br /> ` $DC ,eligible costs <br /> SDC per unit of service <br /> fmpect Measurement - <br /> 1.2 Transportation System Cost of Service [add cost per trip for: street system (x570.47) <br /> + street lighting (585.17) + bicycle path system (660.56) + bicycle path system lighting <br /> (67.49) =total cost per trip (6723.69)]: <br /> 1.2.1 Street System Cost of Service <br /> EQtmula: <br /> Miles per trip'; <br /> X Cost per lane mile = Cost per trlp <br /> . <br /> tY <br /> r lane fe"`;;>;:;.. <br /> rn' <br /> •Ca aci e t <br /> Calculation. <br /> E} 7665 <br /> ; ~ <br /> X $02,371 - $570 47, (Per fop} <br /> 875 : . <br /> 1.2.2 Street Light System Cost of Service <br /> Formula: <br /> Alliles per trtp ` <br /> ' X Cost r ht = `Cost per trip <br /> 9 <br /> Pe. <br /> Capacity per lane tulle <br /> Calculation• <br /> 0.7665. <br /> X $3,000 ` = $85.17 (per trip} <br /> 27. <br /> :Proposed Methodologies: City of Eugene SDCs (Effective March 01, 1997) Page G-1 <br /> <br />