<br /> ~ ? ~ <br /> ~ <br /> This general approach is illustrated in Figure 1 and can be outlined in the following steps: <br /> 1) Determine System Service Characteristics. <br /> • system consists of several components (e.g., lines, pump stations, force mains, <br /> man[~holes are components of the Esartitangrsewer] wastewater system). <br /> • establish impact measure -that feature of development that best reflects use of <br /> system capacity (e.g., trips for the transportation system, impervious surface for the <br /> fsterrn3 stormwater system, etc.). <br /> 2) Determine System Value, irt~ct<ut~~st>~,~t+~tt suc as esign, cons ct oink <br /> right of way'~act~uiition Nand pi~c~~!~ adni'3ii~#~t~ratiori. <br /> • Use replacement cost (current construction costs). <br /> • Determine Non-assessable cost of system. , <br /> • Determine ratio of Improvement and Reimbursement portions of charge, if any. <br /> 3) Allocate the system value to the unit of impact e.g., cost per unit`~f~{fj impervious area for <br /> {starm-sewers} stf?4~Rw~k~~~' ~~t~; <br /> 4) Determine the service impact of speafic development types ~e.g., SFD, mobile home parks, <br /> etc. jr <br /> Final calculations will be rounded to the nearest dollar. <br /> 2.2.1 Administrative Costs <br /> administrative charge shall be included in each <br /> SDC imposed. This charge is to recover direct and indirect costs incurred in complying with <br /> the requirements of state law and the cost of administering the SDC. These costs include <br /> ~'°~nd on-going <br /> annual costs. Total annual administrative costs are estimated , ~ Oj annually. <br /> These costs will be recovered through a charge t±~!>;;tx <br /> , , <br /> dui«_p~~#=;;the total of the system-specific charges for each development before <br /> a I in an exem tion or credit~~~':~ ,.a~~zl: ~f <br /> 2.2.1 IVlax# ~AdmFiFrf~'~~a <br /> Atr admigistiy~ ~h ,max'ch#u~rt :Stir <br /> 530,OOt1,Op =fow: a strlgi+lt`~~}tif±@'~~~f°~#~'~#at its ate is~rter~`'for diff~t <br /> phases of the same :~fe~~`~~:a~~~ ,~r#tturtistratii?e charge s~aif <br /> applied to each permit incrlt!~~`" . <br /> Proposed Methodologies: City of Eugene SDCs (Effective March 01, 1997) Page 8 <br /> <br />