~ ~ t <br /> <br /> ~Y ~ <br /> Table of Contents <br /> Table of Contents <br /> Methodologies 1 . <br /> Appendix A -Systems Development Charges Ordinance A-1 <br /> Appendix B -Definition of Terms B-1 <br /> Appendix C -Transportation System Charge Detail C-1 <br /> Appendix D -Wastewater System Charge Detail D-1 <br /> Appendix E -Stormwater System Charge Detail E-1 <br /> Appendix F -Parks System Charge Detail F-1 <br /> Appendix G -SDC Fee Schedule and Formula Detail G-1 <br /> List of Attachments <br /> Attachment 1 -Trip Rates C-12 <br /> Attachment 2 -River Road/Santa Clara/Highway 99 Area <br /> -City Wastewater SDC Rate D-2 <br /> List of Tables <br /> Table 1 -Summary of Systems Development Charges 6 <br /> Table 2 -Potential Credits for Systems Development Charges 21 <br /> Table 3 -Transportation Systems Development Charge Analysis C-4 <br /> Table 4 -Local Wastewater Systems Development Charge Analysis D-3 <br /> Table 5 -Regional Wastewater Systems Development Charge Analysis D-11 <br /> Table 6 -Stormwater System Development Charge Analysis E-3 <br /> Table 7 -Parks Systems Development Charge Analysis F-2 <br /> List of Figures <br /> Figure 1 -Rate Setting Methodology 7 <br /> Figure 2 -Transportation System, Streets C-3 <br /> Figure 3 -Transportation System, Off-Street Bike Paths C-9 <br /> Figure 4, -Local Wastewater System D-4 <br /> Figure 5 - MWMC Wastewater System D-10 <br /> Figure 6 -Stormwater System E-2 <br /> Figure 7 -Parks System F-3 <br /> Proposed Methodologies: City of EugeneSDCs (Effective March 01, 1997) <br /> Table of Contents <br /> <br />