r <br /> Attachment #7 of Exhibit A <br /> Administrative Order No. 58-97-07 <br /> Page 5 of 8 j~ <br /> 2.2.1 Process Wastewater <br /> The MWMG SDC far development that discharges process wastewater to the <br /> wastewater system will be charged on the basis of the strength of that discharge. The <br /> rates per -FEU far land uses fisted in Attachment 4 of this Appendix include process <br /> wastewater charges. For uses not othe?wise listed in Attachment 4 that include <br /> process wastewater, the'MWMC SDC will be calculated by combining the charge for <br /> unit of development for general industrial uses, and adding the charge for the process <br /> wastewater FEU that. matches the strength of the proposed discharge.. The strength <br /> classes shown-in Attachment 4 are the same strength Gasses used by MWMC in the <br /> user fee system.. <br /> . •ngs_ a~ <br /> -f~3] 2.2.2 Regional Wastewater SDCs For All f6ther] New Development <br /> with Annual Average Daily Flow Equal to or Greater than 100,000 <br /> Gallons, amd for Existing Developmentincr~sing Flow by or Greater <br /> than 100,000 Gallons .per Day <br /> Before calculating the SDC for any development with ar? antiapated discharge of <br /> 100,000 gallons; or more of s®wage per day, the Executive Officer of the MWMC (EO} <br /> shall examine the developments Impact on the: fiwenty year schedule of capital <br /> projects, if one or more capacity-increasing projects wilt move rota the 5-yeaf CIP as a <br /> result of the development; ,the EQ wilt establish new unit casts (based on the tots! <br /> casts of the amended 5-year CIP} upon which. SDCs for all development will. be <br /> calculated: if the MWMC SDG rate is modified, fhe modified fee will. be applied to the <br /> development that caused. the need for the modification and` to all future development. <br /> <br /> Proposed: July 7, 1997 City of Eugene SDC Methodology Page D-10 <br /> <br />