New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-97-07-F
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-97-07-F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 4:11:44 PM
Creation date
8/15/2008 11:04:23 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
MWMC SDC Methodology
Document_Date
7/2/1997
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
f , <br /> Attachment #4 of Exhibit A <br /> Administrative Order No. 58-97-07 <br /> Page 2 of 2 <br /> Commission. On May 15, 1997, the Commission adopted the {Regtanalj <br /> MWMC Systems Development Charge which includes a regional <br /> administrative charge. In accordance with the agreement, the City of Eugene must adopt rates <br /> and charges not less than those required by the Commission. <br /> jl <br /> The 11AW~UIC SDC (also-known:as the Regional Wastewater SDC} ' <br /> . ' formula is ::based. on the allocation of cosfs of existing or <br /> planned .capacity to Average 'Flow, Peak... Flow, Biochemical Oxygen. Demand (BOD) and <br /> Suspended Solids (SS) components of,the regional facilities. These cost allocations are used <br /> tt~ derive a cost per. Flaw Estimation Unit (FEU}, far each type of land use;'` The Regional <br /> Wastewater SDC is tletem~ined by multiplying the applicable FEU cafe per unit.: of measure for <br /> a speafia land -use type, by the units of measure far the proposed development, The Regional <br /> Wastewater system Cast of Service fomxila per unit of development can be found in Appendix <br /> D The Regional Wastewater SDC rates can be found in the current adopted fee schedule <br /> in Appendix G. <br /> ~ <br /> The Regional Wastewater SDC IVlethodobgy provides Thai areview- of the Capitat <br /> Imprave~rren#_Plan (CIP) wip be initiated at such time as any single development with an <br /> anticipated discharge of 100,000 gallons .per day or more., applies for a building .permit or for <br /> connection to-the system.. The purpose of .this review is to determ'?ne if the demand placed on <br /> the regional system by that new user will require a change in the timing of fu#ure capital <br /> projects that wilt impact the amount of the Regional SDC. If-this occurs, the. improvement fee <br /> portion of the charge will be modified:to reflect the value of the new schedule of capacity <br /> ~ increasing improvements, and the modified fee will be applied to the development that caused <br /> the .need for the modification and to all future-development.. <br /> i <br /> i <br /> Proposed: July 7, 1997 City of Eugene SDC Methodology Page 8 <br /> <br /> i <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.