~ Attachment #9 of Exhibit A <br /> Administrative Order No. 58-97-07-F <br /> Page 1 of 1 <br /> Table of Contents , <br /> M+ethodolog 1 _ <br /> Appendix A Systems Development Charges Ordinance A-1 <br /> Appendix B Definition of Terms B-1 <br /> Appendix C Transportation System Charge Detail C-1 <br /> .Appendix D Wastewater System Charge Detail D-1 <br /> Appendix E Stormwater System Charge Detail E-1 <br /> Appendix F Parks System Charge Detail F-1 <br /> Appendix G SDC Fee Schedule and Formula Detail G-1 <br /> List of Attachments ° <br /> Attachment 1 -Trip Rates C-11 <br /> Attachment 2 -River Road/Santa Clara/Highway 99 Area <br /> -City Wastewater SDC Rate D-2 <br /> Attachment 3 - MWMC SDC Credit Rates D-10 <br /> Attachment 4 - MWMC (Regional) Wastewater SDC Rates D-11 <br /> List of Tables <br /> Taible 1 - Su mary of Systems Development Charges 3 <br /> Table 2 -Pot ntial Credits for Systems Development Charges 15 <br /> Table 3 - Tra sportation Systems Development Charge Analysis C-5 <br /> Tajble 4 - Lo I Wastewater Systems Development Charge Analysis D-3 <br /> Talble 5 - M C (Regional) Wastewater Systems Development Charge Analysis D-9 <br /> Table 6 - Sto mwater System Development Charge Analysis E-3 <br /> Tacble 7 - Par s Systems Development Charge Analysis F-2 <br /> List of Figures <br /> Figure 1 - Ra a Setting Methodology 5 <br /> Figure 2 - Tr nsportation System, Streets C-4 <br /> Figure 3 - Tr nsportation System, Off-Street Bike Paths C-8 <br /> Figure 4 - Lo I Wastewater System D-4 <br /> Figure 5 - M C Wastewater System D-8 <br /> Figure 6 - St rmwater System E-2 <br /> Figure 7 - Pa ks System F-3 <br /> <br /> my 7, 1997 City of Eugene SDC Methodology Table of Contents <br /> <br />