New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-97-07-F
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-97-07-F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 4:11:44 PM
Creation date
8/15/2008 11:04:23 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
MWMC SDC Methodology
Document_Date
7/2/1997
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
{ I _ <br /> II_ <br /> <br /> j ~ ~ rj Attachment #4 of F~chibit A <br /> Administrative Order No. 58-97-07-F <br /> Page 2 of 2 <br /> The M C SDC (also known as the Regional Wastewater SDC) formula is based on the <br /> allocatio of costs of existing or planned capacity to Average Flow, Peak Flow, Biochemical <br /> Oxygen errand (BOD) and Suspended Solids (SS) components of the regional facilities. <br /> These t allocations are used to derive a cost per Flow Estimation Unit (FEU), for each type <br /> of land u e. The Regional Wastewater SDC is determined by multiplying the applicable FEU <br /> rate per nit of measure for a speafic land use type, by the units of measure for the proposed <br /> _ develop ent. The Regional Wastewater system Cost of Service formula per unit of <br /> develop ent can be found in Appendix D. The Regional Wastewater SDC rates can be found <br /> in the cu ent adopted fee schedule in Appendix G. <br /> The Re Tonal Wastewater SDC Methodology provides that a review of the Capital <br /> Improve ent Plan (CIP) will be initiated at such time as any single development with an <br /> anticipat d discharge of 100,000 gallons per day or more applies for a building permit or for <br /> connecti n to the system. The purpose of this review is to determine if the demand placed on <br /> the regio al system by that new user will require a change in the timing of future capital <br /> projects at will impact the amount of the Regional SDC. If this occurs, the improvement fee <br /> portion f the charge will be modified to reflect the value of the new schedule of capacity <br /> increasin improvements, and the modified fee will be applied to the development that caused <br /> the need for the modification and to all future development. <br /> 0 Stonmw er System <br /> J ly 7, 1997 City of Eugene SDC Methodology Page 8 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.