<br /> r <br /> i <br /> The northern alf of this S.5 acre site, which is adjacent to the river will not be changed. All <br /> the trees and egetation will remain as they exist at this time. <br /> i <br /> As the earlier development plan proposed to add vegetation in the form of rose beds, lawn, <br /> does the modifications be' ro osed in the current development plan. <br /> 00 <br /> nin sot ~ P P <br /> scree <br /> I~'~ and g <br /> The rose beds and lawn area in the southern half of the site will be redefined and actually <br /> increase the ount of vegetation on the site. <br /> Tl~e existing evelopment plan shows an outdoor patio to be built on the northeast side of the <br /> . community re tal building, facing the river. The new proposal is to relocate the outdoor <br /> patio to thew t side of the building and to add companion planting beds on the side of the <br /> building whic faces the river. <br /> One of the c ges in this proposal is to remove and replace the older structure, that is in the <br /> mfiddle of the ark, with a new community rental building. The existing building is <br /> a ' roximatel 4,000 square feet in area, including the garage. The new building will be <br /> PP <br /> significantly aller with approxunately a 25 % reduction in floor area. The existing <br /> structure is a proximately 300 feet from the river bank, the new building will be in the same <br /> la~ation. Pa of the function the old structure served was to house the maintenance activities <br /> in the park. his activity is proposed to be relocated further away from the river to the <br /> saiuthwest co er of the site, approximately 550 feet from the river bank. This will serve to <br /> increase the oust of open space and vegetative screening between the maintenance activity <br /> at~d the river. <br /> • necessary public access will be provided to and along the river by <br /> approp ' e legal means. <br /> the river from the terminus of <br /> The resent s to develo went rovides for public access to <br /> P P P <br /> lan is to <br /> 1 on the new <br /> e rose arden on avel aths. A ro osa p <br /> ou h th P P <br /> rson Str t thr P <br /> Jeffe g g ~ <br /> install a hard urface on the existing major loop path. This will improve the access to the <br /> river and pro ide access for the mobility impaired. The existing bike path that runs along the <br /> south bank o the Willamette river will remain unchanged. Comments received from the City <br /> Lund Use M gement Section note that the plans indicate eight bicycle parking spaces which <br /> uired for the ro osed new buildin . Because the Rose Garden is located <br /> is the minim re g <br /> P P <br /> q <br /> ms more arkin s aces to <br /> as ' orta t connection oint between bike ath syste p g p <br /> at P <br /> P <br /> accommodate users should be provided. In addition, it is recommended that the spaces be <br /> improved as ng-term spaces. Plans for the location and improvements shall be coordinated <br /> with the City Land Use Management Section. <br /> bic cle arkin and the ositive findings pertinent <br /> V4~ith the mcl sion of additional spaces for y p g p <br /> VSTillamette G eenway Criteria, this proposal is consistent with the conditional use approval. <br /> I'~ C7WEN RO E GARDEN (MD 97-6) (C(J 84-23) <br /> Page 7 <br /> <br />