R- .302-F Co mon Trench and Co-location Re uirements. <br /> 1. In ddition to the requirements of Section 7.302 of the Eugene Code, 1971 <br /> a d these Rules for co-location of and undergrounding of facilities, providers shall utilize <br /> c mmon trench s for placement of multiple provider facilities to be installed within the <br /> s me street seg ent unless otherwise approved by the Utility Inspector. <br /> 2. Pr eiders shall comply with the notice requirements of R-7.302-C-2. of these <br /> ru es. In additio , no street segment shall be reopened for placement of new facilities by <br /> #h se utilities or I tense holders who received notice pursuant to R-7.302-C-2. above within <br /> th subsequent 12 month period, without the written approval of the City Engineer or <br /> d signee. <br /> R 7.302-G Pr vision of Facili Location Information. <br /> 1. Fa i!i Locate service. All providers must provide facility locate services <br /> in response to to ate requests from excavators working in the area ofunderground-facilities <br /> o ned or operat d by a provider. Providers must demonstrate the ability to provide such <br /> rvices by sub fitting documentation to the City showing proof of subscription to the <br /> b egon Utility N tification Center along with evidence of resource commitments to locate <br /> s rvice provisio either through the capacity of provider employees or through contractual <br /> reement with locate service provider. <br /> 2. Pr vision of Facili Ma and Location Data. All providers shall comply <br /> w th the Mappin and Location Data requirements contained within the license agreements <br /> a d the require ants of Section 3.420 of the Eugene Code, 1971. <br /> '~R 7.302-H B n in and Indemni Re uirements <br /> 1. A ub(ic Way restoration performance bond or security deposit shall be <br /> ',r quired for any project which involves the opening of greater than 400 linear feet of the <br /> p blic way. T e bond or security deposit shah be in an amount determined by the <br /> <br /> ',a plicant and v rifled by the City Engineer equal to the cost of restoring the public way. <br /> T ese costs c uld include such activities as trench backfili, compaction, pavement <br /> r storation and ssociated traffic control. <br /> 1. Permit applicants shall provide the City with cash, a surety <br /> perform nce bond which has been fully executed by applicant and its surety, <br /> guarant ing Applicant's obligations under this paragraph or another type of <br /> security cceptable to City, in its sole discretion. If applicant provides City with a <br /> bond, it hall be in a form acceptable to City, in its sole discretion. <br /> dministrative rder - 7 ~vosis~ _ - <br /> <br />