e waived an the City may take necessary corrective action to remove the hazardous <br /> onditions and charge the costs thereof to the responsible party without prior notification. <br /> C 7.307 (2j <br /> pon complet on of the proposed work, the work site and all disturbed landscaping shall <br /> e restored to condition as near as possible to that which existed immediately prior to the <br /> ork. <br /> .J DAMA E TO EXISTING FACILITIES <br /> he permittee shall be responsible for all damage to public or private property resulting <br /> rom the perm ttee's failure to properly protect property while carrying out the work. EC <br /> .297 (2) <br /> he Utility Ins ector and the owner of any damaged facility must be immediately notified <br /> f damage to ublic or private facilities caused or found by the permittee. When private <br /> ewer lines ar damaged the permittee shall immediately notify the City Building Sewer <br /> nspector of th Public Works Maintenance Planning Section (682-4800). Required repairs <br /> hall meet the State of Oregon Plumbing Specialty Code and be inspected by the Building <br /> ewer Inspec or. The Building Sewer Inspector shall make note, on the City's sewer <br /> onnection re ords, of the damage and of the permittee responsible for the damage. <br /> he permittee shall exercise care to avoid disturbing or destroying survey monuments. <br /> urvey monu ents disturbed by the permittee's work shall be restored in conformance <br /> ith requirem nts of ORS 209.150. <br /> 3.J.1 Dama to Ci Facilities <br /> permittee ho causes damage to a City facility during work activities due to the <br /> permittee's fai ure to follow requirements of OAR 952-001-0010 through 952-001-0090 or <br /> failure to use asonable care to protect City facilities shall be responsible for all costs of <br /> repair or rest ration of the facility. When a City facility is damaged the permittee shall <br /> immediately n tify the Utility Inspector. The Utility !nspector shall submit a damage report <br /> and a subseq ent repair inspection report to the Maintenance Planning Manager. To aid <br /> in the updati g of the infrastructure condition records, the damage repair report shall <br /> include a me sured location and description of the damage and repair. <br /> In the event the permittee contests responsibility for the damage to a City facility <br /> discovered wi hin the permittee's work zone, the permittee shall still be held responsible <br /> for effecting i mediate repairs. The permittee should then be directed to submit a billing <br /> to the Mainte ante Planning Manager showing the exact time and materials expended to <br /> effect the rep irs. Also, the permittee should include, in narrative form, an explanation as <br /> to the cause o the damage, the reasons the permittee should not be held responsible, and <br /> <br /> justification fo the billing. <br /> Dama a to Sanitary Sewers - If the damaged facility is a sanitary sewer line ten <br /> Utility & R/W Per it Policy 25 02/09/98 <br /> <br />