<br /> ` ~ EXHIBIT A (page 3 of 6) <br /> 2.3 haage of Use <br /> When a change of use of an existing development results in an increased impact <br /> on th regional wastewater facilities (as demonstrated by calculating the SDC for <br /> both ses), the SDC will be charged on the increased impact. This is determined <br /> by cal lating what the development's charge would be for the current use, and for <br /> the pr posed use. If the proposed use would result in a higher charge, the <br /> differ ce is collected. <br /> 'i ' <br /> 2.4 WMC SDC Credit <br /> i <br /> A cre it for property taxes on real property paid to retire bonded debt incurred for <br /> the co stnaction of regional wastewater facilities shall be deducted from the MWMC <br /> SDC. The credit shall accrue from the year of annexation to the City, and be <br /> based upon the assessed value of the real property at the time of application for <br /> tonne ion to the system. The current credit is shown in Attachment 4. <br /> 2.5 WMC Administrative Charge _ <br /> f <br /> A fu er adjustment to the regional wastewater SDC is the addition of <br /> admin trative costs. MWMC will incur staff costs for the updating and processing <br /> of the arge. These costs are applied on a per connection basis. The Regional <br /> Waste ater Administrative Charge per permit is applied to the total SDC fees after <br /> all oth r charges and credits have been applied. <br /> ATTACHMENT 3 <br /> MWMC SDC Credit Table <br /> For Fiscal Year 1999 Credit, effective .lul 1, 1998 <br /> Year f „ C~'edit pe($1,000 Year of Credif per $1':,000:. <br /> Annex ~or Assessed Value ' Anrtexatiaa. ;Assessed Value <br /> 197 $4.27 1989 $1.98 <br /> i 198 $4.18 1990 $1.55 <br /> i <br /> 198 $4.12 1991 $1.15 <br /> ~ 198 $3.99 1992 $0.96 <br /> 198 $3.83 1993 $0.83 <br /> 198 $3.68 1994 $0.67 <br /> 198 $3.48 1995 $0.52 <br /> 198 $3.18 1996 $0.38 <br /> 198 $2.82 1997 $0.21 <br /> 198 $2.42 <br /> City of Eugene S C Methodology Page D-10 <br /> <br />