New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-99-16-F-2
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-99-16-F-2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 4:22:05 PM
Creation date
8/14/2008 12:05:46 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
SDC Methodology
Document_Date
10/29/1999
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
T <br /> ICI FIGURE 5 <br /> i~ n a l M W M C Wastewate r S ste m <br /> Fie ( ) y <br /> g <br /> =Existing System Value Future S stem <br /> Level of ''~,ServlCe present value y <br /> Value <br /> Impact mea urement (minus) <br /> ~ Flow -gal ons per day Liabilities, grants, and Impact measurement <br /> a BOD - o nds er da outstanding debt Future value of <br /> P P Y capacity-increasing projects <br /> ~ SS - pounds per day (equals) from CIP <br /> Local equity <br /> i <br /> Formulas: <br /> Unit Cost of Capacity <br /> (All' component costs are added to determine the unit impact per FEU land use) <br /> The costi' of existing plus future system values <br /> allocated to average and peak flow <br /> = Cost per gallon of daily flow <br /> Design flow <br /> The cost of existing plus future system values <br /> allocat~d to Biochemical Oxygen Demand <br /> =Cost per pound of daily BOD <br /> Design BOD capacity <br /> The cos of existin lus future s stem values <br /> 9P Y <br /> ~Ilocated to Suspended Solids <br /> = Cost per pound of daily SS <br /> ~I Design SS capacity <br /> TE: The cost psr unit of Flow, BOD, SS can be found in the current adopted SDC fee schedule in Appendix F <br /> <br /> I <br /> City of Eugene SDC Methodology Wastewater, Page C-9 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.