New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-99-16-F-2
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-99-16-F-2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 4:22:05 PM
Creation date
8/14/2008 12:05:46 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
SDC Methodology
Document_Date
10/29/1999
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br /> I <br /> i, <br /> TABLE 4 <br /> <br /> s ~ ~.oca~ Wastewater Systems Dev±~lopm~nt Charge Analysis.. <br /> 1 Analysis of ystem Value <br /> T tal Replacemenly Cost -Pipe $360,149,545 <br /> T tal Replacemen 'Cost -Pumping Stations $13,748,676 <br /> C ty Cost of future rojects within UGB $8,609,098 <br /> her Wastewater om onents $2 822 003 <br /> T tal Lost of E 'sting Was#ewater System ' $~f35~3~9,322„ <br /> ~ 2 Analysis of As essable Amount <br /> Sze Total Cost <br /> 6 inch i $8,182,997 <br /> 8 to 48-inch ' $272,297,483 <br /> T tal Asse~sa6fe Cosh ' ' $2$0;680,80 ; <br /> 3 Capacity Info ation <br /> :48.9 mgd <br /> T tai Ciily ~yst$ Capacihr <br /> 4 Calculation of I astewater SDC <br /> T tal System Valu tion, existing and planned $385,329,322 <br /> st per unit of ca acity per gallon $1.96 <br /> sidential Rate Structure $258 per RDU + $0.062 per square foot <br /> of living area <br /> n-Residential R to Structure See Table 4A <br /> 5 Calculation or eimbursement Percentage <br /> ity System Capa ity (EDUs) 48.9 mgd 100.00 percent <br /> fisting Use 21.4 mgd 43.76 percent <br /> rcent Available for New Development 27.5 mgd 56.24 percent <br /> tal Value of Res rve Capacity (value of system) $53,884,000 100.00 percent <br /> lue of Increase Capacity (cost of future projects in UGB- Master $8,609,000 ,15.98 percent <br /> Ian) <br /> alue of Reimbursable Capacity (previously paid value-existing users) $45,275,000 84.02 percent <br /> I~~ <br /> City of Eug~'ne SDC Methodology Wastewater, Page C-4 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.