TABLE 2 <br /> Potential Impact Reduction and Credits for Systems Development Charges <br /> *"NOTE: List of possible examples; eligibility depends on compliance with criteria in SDC Policies and <br /> Procedures document. <br /> Trans station S stem <br /> _ <br /> REDUCTII NS: <br /> i Successful ;bus pass program for employees <br /> CREDITS: <br /> Residential: <br /> Street widths > 36 Feet <br /> Commerci I/industrial: <br /> Street widths > 44 feet <br /> Off-site, noj~-contiguous intersections for arterial and collector streets <br /> Transit she~ter and pullout <br /> Street lght$ on arterial and collector streets <br /> Off-site right of way and easement acquisition <br /> Traffic signals <br /> Off-street tricycle paths identified in TransPlan or other City plans <br /> Offsite ub~ic im rovements where a uivalent assessments can be collected <br /> 2: Wastewater S stem <br /> C EDITS` <br /> Public Wastewater collection lines > 8-inch diameter <br /> Public pump stations and pressure lines that serve more than the development <br /> Offsite pudic sewer improvements, where equivalent assessments can be collected <br /> Prior Pa rtnent of Metro olitan Wastewater Service District debt service <br /> 3. 'Storm titer S stem <br /> REDUCT~QNS: <br /> Retention,'system (e.g. DryweNs, infiltration trench) <br /> C EDIT <br /> Stormwat~r collection lines > 24-inch and < 60-inch in diameter <br /> Major drainage channels: construction and off-site easement <br /> Offsite public improvements where equivalent assessments can be collected or that benefit <br /> existin develo ments <br /> 4, 'Parks 5 stem <br /> CREDITS: <br /> Land dedication (for sites accepted by City, consistent with adopted City Plans) <br /> On-site park facility dedication (for improvements accepted by City, consistent with adopted City <br /> Plans <br /> <br /> i <br /> City of Eugene SDC Methodology Page 15 <br /> i <br /> I <br /> <br />