New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-99-16-F-2
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-99-16-F-2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 4:22:05 PM
Creation date
8/14/2008 12:05:46 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
SDC Methodology
Document_Date
10/29/1999
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br /> <br /> ~ 2.2 General Method for City of Eugene SDC Rates <br /> ~r? i <br /> Table 1 provides an overview of the basis of the rate setting methodology; outlining the basic <br /> rates, cost basis, service standards and means of implementation for each system charge. <br /> The inter7t of the methodology is that new development should not be charged for a higher <br /> level of service than that currently provided to the community or to which the community has <br /> committed future resources. Therefore, additional capacity needs are determined using the <br /> City's existing level of service or the City's funded level of service. In a similar manner, new <br /> development should be credited for past and future bond payments on infrastructure related <br /> existing debt (Metropolitan Wastewater Management Commission [MWMC]) and past trunk <br /> sewer levies. <br /> I <br /> 'I <br /> City of Eugene SDC Methodology Page 3 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.