I <br /> it <br /> I <br /> 7.2.3 Previous Payment or Use <br /> In calculating the credits given under this section, the City Engineer shall apply credit only <br /> to the developments for which the previous use or payment can be verified. Credit for <br /> previous use will be based on the most recent documented use <br /> t~ <br /> except, in the case of redevelopment hatwyill change the_use of a building tn;ts.entilC~ty <br /> when the credit for`previous use-will be'~based on-the; previous most intense.venfiabie;E!pse <br /> per ~ ystem. In this specific case..;of~tedevelopment,=;;the credit calculation wlk,be <br /> i performed independently for each systemvirhich may resulf in different phases`'of,the:~use <br /> of the site being the basis of compariso~t~ arrd~ The burden of proof is on the applicant to <br /> provide adequate documentation. <br /> 7.2.3.1 Pre-existing Development Credit <br /> When an applicant for development of vacant land establishes that the land was <br /> previously improved with structure(s) which were demolished, a reduction for the <br /> demolished structure(s) shall be granted provided a reduction for the demolished <br /> structure(s) has not been previously given. <br /> 7.2.4 City Cost of Construction Credit <br /> In calculating the credits given under section 7.2.1 and 7.2.2, the City Engineer shall <br /> estimate the cost of the capital improvement based upon what the City would pay were <br /> it to construct such improvements. <br /> 7.2.5 Revenue Collection for Equivalent Assessment or Special Benefit Credit <br /> ? When an equivalent assessment or a special benefit assessment is collected when <br /> ~ property connects to a public improvement for which the City has granted a credit under <br /> t 7.2.2 (3) above, the revenue collected (net of the costs of collection) shall be deposited <br /> in the SDC fund for the system to which connection was made and for which the credit <br /> was given unless the SDC fund has been reimbursed for the credit from other City funds. <br /> If the SDC fund has been reimbursed in advance from other City funds, the revenue <br /> J - ~ collected will be deposited to the City fund which reimbursed the SDC fund. <br /> 7.3 Revocation of Credit and Impact Reduction <br /> A credit or impact reduction which has been applied to reduce SDC fees may be revoked and <br /> the unpaid portion of the SDC reimposed as a lien against the property, within the time required <br /> by these Methodologies, if: <br /> (1) The associated capital improvement for which SDC credit has been given is not <br /> ' constructed or completed as required, or fails to function as designed; or <br /> <br /> i <br /> (2) The associated reduction program for which an impact reduction has been approved is <br /> not instituted or is modified without the approval of the City Engineer, or ceases to <br /> function as designed. <br /> Such revocation shall not occur until ten days prior written notice has been given to and an <br /> opportunity to be heard afforded the permittee and property owner. If the credit or impact <br /> reduction is revoked, the City Manager may add to the amount due, the cost of the revocation <br /> City of Eugene SDC Methodology Page 13 <br /> <br />