Formulas for Non-Residential Development: <br /> I System Valuation {value of existing + value of planned) <br /> Build-out Capacity (mgd) _ Cost per Unit of Capacity <br /> ~I <br /> i <br /> Per unit of capacity x flow per PFU for development type x number of PFUs for development <br /> <br /> ~ SDC charge for development <br /> <br /> 1 <br /> <br /> i <br /> <br /> ! Calculations for Non-Residential Development: <br /> <br /> i <br /> $87.241 M + 8.609 M <br /> _ $'1.9fi per gal/day <br /> <br /> j 48.9 mgd <br /> <br /> i <br /> <br /> I <br /> $1.96 xGal/PFU {varies by development type) x number of PFUs = <br /> SDC charge for development <br /> <br /> i <br /> <br /> i <br /> 1.3.2 Regional (MWMC) Wastewater System Cast of Service <br /> <br /> ~ Formulas• <br /> <br /> I <br /> Existing and increased plant Local......, <br /> Equity related to average flow Cost per gallon of <br /> average daily flow <br /> Average daily design flow <br /> <br /> i <br /> ~ ~ Existing and increased plant Local <br /> Equity related to peak flow Cost per gallon of <br /> <br /> j = peak daily flow <br /> Average daily design flow <br /> <br /> ~ .:Existing and increased .plant Local Equity <br /> related to total suspended solids Cost per pound <br /> = of suspended solids <br /> Design suspended solids <br /> <br /> i <br /> Calculations: <br /> ~ ; <br /> $16,037,000 <br /> $0.327 (per,gallon of average daily flow). <br /> 49,000,OgO <br /> i <br /> (City of Eugene SDC Methodology Fee Schedule & Formulas, Page F-4 <br /> <br />