2.3 Change of Use <br /> When a change of use of an existing development results in an increased impact on the regional <br /> wastewater facilities (as demonstrated by calculating the SDC for both uses), the SDC will be charged <br /> on the increased impact. This is determined by calculating what the development's charge would be <br /> for the current use, and for the proposed use. If the proposed use would result in a higher charge, the <br /> difference is collected. <br /> 2.4 MW~~ Wastewater SDC Credit <br /> A credit for property taxes on real property paid to retire bonded debt incurred for the construction of <br /> regional wastewater facilities shall be deducted from the MWMC wastewater SDC. The credit shall <br /> accrue from the year of annexation to the City, and be based upon the assessed value of the real <br /> property at the time of application for connection to the system. The current credit is shown in <br /> Attachment 3. <br /> 2.5 MWMC Wastewater Administrative Charge <br /> A further adjustment to the MWMC wastewater SDC is the addition of administrative costs. MWMC <br /> <br /> will incur staff costs for the updating and processing of the charge. These costs are applied on a per <br /> connection basis. The MWMC wastewater administrative charge per permit is applied to the total <br /> SDC fees after all other charges and credits have been applied. <br /> Attachment 3 <br /> Re rl~nal MWMC Wastewater SC~?G ~redit'Rates <br /> For Fiscal Year 2000 Credit, effective Se tember 15, 1999 <br /> Year of Credit per $1,000 - Year a# Credit per $1,000: <br /> Annexation. Assessed Value Annexation .Assessed Value <br /> 1979 $4.47 1989 $2.18 <br /> 1980 $4.38 1990 $1.75 <br /> 1981 $4.32 1991 $1.35 <br /> r ' <br /> 1 1982 $4.20 1992 $1.17 <br /> 1983 $4.03 1993 $1.03 <br /> 1984 $3.88 1994 $0.86 <br /> 1985 $3.68 1995 $0.71 <br /> 1986 $3.38 1996 $0.57 <br /> 1987 $3.03 1997 $0.39 <br /> 1988 $2.62 1998 $0.18 <br /> City of Eugene SDC Methodology Wastewaterpage C-11 <br /> <br />