New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-99-22-F
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-99-22-F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 4:24:41 PM
Creation date
8/14/2008 12:05:42 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
SDC Methodology
Document_Date
2/15/1999
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> . <br /> ` ~ 3. Multiply the total cost per FEU for a development type by the number of FEUs for a <br /> development application. <br /> + For more detailed and specific numerical data on FEU calculations, see Table 5. For formula <br /> illustrations, see Figure 5 in this Appendix. <br /> 2.2.1 MWMC Process Wastewater <br /> ~he MWMC wastewater SDC for development that discharges process wastewater to the <br /> wastewater system will be charged on the basis of the strength of that discharge. The <br /> rates per FEU for land uses listed in Attachment 4 of this Appendix include process <br /> wastewater charges. For uses not otherwise listed in Attachment 4 that include process <br /> wastewater, the MWMC SDC will be calculated by combining the charge for unit of <br /> development for general industrial uses, and adding the charge for the process wastewater <br /> FEU that matches the strength of the proposed discharge. The strength classes shown <br /> in Attachment 4 are the same strength classes used by MWMC in the user fee system. <br /> 1 <br /> Z.Z.Z MWMC Wastewater SDCs For All New Development with Annual Average <br /> Daily Flonnr Equal to or Greater than 100,000 Gallons, and for Existing Development <br /> ~ Increasing Flow by or Greater than 100,000 Gallons per Day <br /> i <br /> Before calculating the SDC for any development with an anticipated discharge of 100,000 <br /> gallons or more of sewage per day, the Executive Officer of the MWMC (EO) shall examine <br /> the developments impact on the twenty year schedule of capital projects. If one or more <br /> capacity-increasing projects will move into the 5-year CIP as a result of the development, <br /> the EO will establish new unit costs (based on the total costs of the amended 5-year CIP) <br /> ~ upon which SDCs for all development will be calculated. If the MWMC wastewater SDC <br /> rate is modified, the modified fee wilt be applied to the development that caused the need <br /> for the modification and to all future development. <br /> i <br /> i <br /> i ~ <br /> I <br /> i <br /> ~ a <br /> City of Eugene SDC Methodology Wastewater, Page C-8 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.