i <br /> i I <br /> FIGURE 2 <br /> <br /> 'i <br /> ~ <br /> PORTATION SYSTEM <br /> TF~AN S <br /> STREETS <br /> Level of Service <br /> LO!S D as specified System Value <br /> in ~"ransPlan <br /> Impact measurement Non-assessable <br /> construction cost <br /> a Trips generated per lane mile <br /> ~ `~/ehicle mile traveled <br /> •'\'sw.\ <br /> I <br /> Formula: <br /> i~ <br /> Cost of Service (PER TRIP) <br /> Miles per trip Cost Cost <br /> X per = per <br /> Capacity per lane mile lane mile trip <br /> ote: The cost per trip, can be found in the current adopted SDC fee schedule in <br /> ppendix F. <br /> City of Eugene SDC Methodology Transportation, PageB-4 <br /> <br />