New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-99-22-F
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-99-22-F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 4:24:41 PM
Creation date
8/14/2008 12:05:42 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
SDC Methodology
Document_Date
2/15/1999
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br /> Unit of Dev lopment (Unit): For purposes of the Transportation SDC and the Metropolitan <br /> Wastewater anagement Commission SDC, the unit of development is that measurement of the <br /> size of a de elopment upon which the charge is based. For the Metropolitan Wastewater <br /> Management Commission SDC, the Unit is called an FEU. The Unit is typically 1,000 square feet <br /> of building ar a for most commercial users, and dwelling units for residential development. Other <br /> measures ar used, as appropriate for each type of development. The units for each development <br /> type ar# rho n for the Transportation SDC in Attachment 1, Transportation Trip Rates, on page <br /> B-11 and for he regional Metropolitan Wastewater Management Commission (MWMC) SDC in <br /> Attachment 2 Regional (MWMC) wastewater SDC Rates, on page C-11. <br /> <br /> ~ ~ <br /> ~,I <br /> City of Euge a SDC Methodology Definitions, Page A-4 <br /> I <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.