I <br /> ~ w <br /> ~ ~ <br /> i <br /> I <br /> ' TABLE 2 <br /> <br /> 'r Po ntial Impact Reduction and Credits for Systems Development Charges <br /> **NOTE: Li t of possible examples; eligibility depends on compliance with criteria in SDC Policies and <br /> j Pr cedures document. <br /> 1, ns rtation S stem , <br /> REDUCT ONS: <br /> Successfu bus pass program for employees <br /> CREDITS: <br /> Residentia <br /> Street idths > 36 Feet <br /> Commerci I/Industrial: <br /> Street idths > 44 feet <br /> Off-site, n n-contiguous intersections for arterial and collector streets <br /> Transit sh Iter and pullout _ <br /> Street light on arterial and collector streets <br /> Off-site rig t of way and easement acquisition <br /> Traffic sig Is <br /> Off-street icycle paths identified in TransPlan or other City plans <br /> Offsite ub is im rovements where a uivalent assessments can be collected <br /> 2. Waste afar S item <br /> ~1ww CREDIT <br /> Public W stewater collection lines > 8-inch diameter <br /> Public pu p stations and pressure lines that serve more than the development <br /> Offsite pu lic sewer improvements, where equivalent assessments can be collected <br /> Prior Pa ant of Metro olitan Wastewater Service District debt service <br /> 3. Storm afar S stem <br /> C <br /> R~ention system (e.g. Drywalls, infiltration trench) <br /> CREDITS <br /> Stormwat r collection lines > 24-inch and < 60-inch in diameter <br /> Major drai age channels: construction and off-site easement <br /> Offsite pu lic improvements where equivalent assessments can be collected or that benefit <br /> existin d veto ments <br /> 4. Parks s#em <br /> _ <br /> CREDITS: <br /> Land dedica ion (for sites accepted by City, consistent with adopted City Plans) <br /> On-site par facility dedication (for improvements accepted by City, consistent with adopted City <br /> Plays <br /> ~I <br /> i <br /> City of Euge a SDC Methodology Page 17 <br /> <br />