System. Valuation (value of existing + value of .planned) <br /> Build-out Capacity (mgd) = Cost per Unit of Capacity.. <br /> Per unit of capacity x flow per'PFU for development type x number of P. FUs for development = <br /> SDC charge'for development <br /> Calculations for Non-Residential Development• <br /> $87.241 M + 8.609 M <br /> _ $1.96 per gal/day <br /> 48.9 mgd <br /> $1.96,.x Gal/PFU {varies by development type) x number of PFUs = <br /> SDC charge for development <br /> 1.3.2 Regional (MWMC) Wastewater System Cost of Service <br /> Formulas: <br /> Existing and increased plant Local <br /> Equity vela#ed to average flow Cost per gallon of <br /> = average daily flow <br /> Average daily design-flow <br /> Existing and' increased'`plant Local <br /> Equity related to peak flow Cost per gallon of <br /> _ peak daily flow <br /> - Average daily design.-flow <br /> Existing and increased plant Local Equity <br /> related to total suspended solids Cost per pound <br /> = of suspended solids <br /> Design suspended solids <br /> Calculations: <br /> $16, 037, 000 <br /> _ $0.327 (per gallon of average daily flow) <br /> 49, 000, 000 <br /> <br /> City of Eugene SDC Methodology Fee Schedule & Formulas, Page F-4 <br /> <br />