C =Cause where, unavoidable accident = 0, negligence =20, intentional =25 _ <br /> E =Effort to correct the violation point total (see Table E) <br /> G = Gravity/Magnitude component point total (see Table G) <br /> M =maximum. penalty allowed <br /> Z = "0" If cause is an unavoidable accident, "1" if cause is negligence or intentional <br /> TABLE E: Effort Points <br /> Major Effort -Took all steps feasible to correct violation within 0 <br /> time frame <br /> Moderate Effort -Took some steps to stabilize situation or to 5 <br /> correct violation within time frame, additional effort required, <br /> gravity and magnitude improved by effort <br /> Little or No Effort- Took minimal or no effort to correct 10 <br /> violation- violation still exists with same or increased gravity <br /> and magnitude <br /> Hindered Effort -Withheld information, provided false 20 <br /> information or otherwise hindered efforts to correct violation <br /> TABLE G: Gravity/Magnitude Points <br /> Failure to adhere or implement condition creates health and 30 <br /> safety risks to persons or property <br /> Failure to revegetate or otherwise stabilize up to 25% of 5 <br /> required area <br /> • Failure to revegetate or otherwise stabilize 25-50% of required 10 <br /> area <br /> Failure to revegetate or otherwise stabilize 50-75% of required 15 <br /> area <br /> Failure to revegetate or otherwise stabilize 75-100% of required 25 <br /> area <br /> Failure to stabilize steep slope (25% or more) 10 <br /> Failure to stabilize moderate slope (10% to 24%) 5 <br /> <br /> Administrative Order - 12 r:\adminord\rule\OOtreerem2ao.wpd(03/14/00) <br /> <br />