i <br /> <br /> i <br /> *Footage is the total footage of the lot that abuts street <br /> right of wa . <br /> Modificatio to an approved street tree plan: Same as the initial fee <br /> 2. <br /> I <br /> Developme t of Street Tree Plan Agreement 200.00 <br /> ~ 'Shm@Il~: <br /> Annual m ntenance inspections over <br /> three-year stablishment period (per year): <br /> 1-9 ees 150.00 <br /> 10+ rees-additional fee per tree 1.00 <br /> Replacemen inspection at conclusion of <br /> establishme t period: <br /> 1-9 ees 150.00 <br /> 10-4 trees 200.00 <br /> 50+ ees-additional fee per tree 1.00 <br /> In addition t the above fees, a security bond or cash deposit sufficient to ensure performance under <br /> the approve Street Tree Plan shall be provided to the City based on the following formula: <br /> a) Measure the total length of lots within or abutting the street right of way in the area <br /> being developed. <br /> b) Subtract 15 feet for each leg of the vision clearance zone of each intersection <br /> included within the development. <br /> c) Subtract 30 feet for each residential lot or 80 feet for each commercial or industrial <br /> lot within the development (representing future driveways). <br /> d) Divide by 30. <br /> e) Multiply by 1.10 (representing the 10% anticipated tree mortality). <br /> f) Multiply by $300 for local streets or $400 for collector or arterial streets. <br /> Trees which ail during the establishment period and are replaced will extend the establishment <br /> period an ad itional three years from the date of the replanting for those trees. <br /> The develop may either request the release of the security bond or cash deposit once all trees on <br /> !i the develop ent have completed their establishment period, or annually request the release of the <br /> !I EXhlblt A - 2 r:~adminord\fees\OOtreefeeexa.wpd(03/14/00) <br /> ~I <br /> <br />