i <br /> ~ Fairway Loop Connector road (Southwood Lane) was constructed to provide a link <br /> between Coburg Road and Country Club Road <br /> NO ,THEREFORE, <br /> Bas d on the above findings, the findings contained in Exhibit A attached hereto and <br /> inco orated herein by reference, the authority contained in section 5.040 of the Eugene <br /> Cod 1971, and the delegation order of the City Manager, the Traffic Engineer of the City <br /> ` of E gene orders that: <br /> 1. Fairway Loop shall be closed to through traffic at a point approximately 300 feet <br /> ~ south of the centerline of Eastwood Lane. <br /> ~ 2. Pedestrian and bicycle access shall be provided through the barricade. <br /> i <br /> E 3. This order shall take effect on the date the signs and barricades are installed. <br /> Dat d this ~ r, Day of February, 2000 <br /> <br /> ~i <br /> Ga L. ke, P.E., City Traffic Engineer <br /> <br /> i <br /> <br /> i <br /> <br /> i <br /> <br /> i <br /> <br /> i <br /> <br /> i <br /> i <br /> Page 2 of 9 <br /> <br />