f <br /> Formulas for Non-Residential Develo ment: <br /> System .Valuation (value of existing + value of panned) <br /> Build-out Capacity (mgd) = Cost per Unit of Capacity <br /> Per unit of capacity x flow per PFU for development type x number of PFUs for development = <br /> SDC charge for development,, <br /> alculations for Non-Residential Develo ment: <br /> $89.'946 M +`8.876 M <br /> _ $2.02 per_gal/day <br /> 48:9 mgd <br /> $2.02 xGal/PFU (varies by development type) x number of PFUs = <br /> SDC charge. for development <br /> 1.3.2 Regional (MWMC) Wastewater System Cost of Service <br /> ormulas: <br /> Existing and increased plant Local <br /> Equity related to .average :flow Cost per gallon of <br /> - = average daily flow <br /> Average.-daily design flow <br /> Existing and increased plant Local <br /> Equity related to peak flow Cost per gallon of <br /> = peak-daily flow <br /> Average daily design flow <br /> <br /> j <br /> <br /> I Existing. and ..increased plant.. Local Equity <br /> related tto total suspended solids Cost per pound <br /> = of suspended solids <br /> Design suspended solids <br /> Calculations: <br /> $16,037,000 <br /> _ $0.327 (per gallon of average daily flow) <br /> 49, 000., 000 <br /> City of Eu ene SDC Methodology Fee Schedule & Formulas, Page F-4 <br /> <br />