TABLE 1 <br /> SUMMARY OF SYSTEMS DEVELOPMENT CHARGES <br /> Transportation Wastewater'- Local,(City), Wastewater -Regional (MWMC) Stormwater Parks <br /> Cost per trip = Cost per new residential Costs are based on the type of land Cost per square foot of Cost per <br /> $754.63. units (e.g., single-family, use and, for industrial dischargers impervious surface area = Dwelling Un' <br /> mobile home parks, with process flows, on the strength $0.168. Cost per single-family = $945.05. <br /> duplexes, apartments) of discharge. The rate varies by development (SFD) with buildin <br /> ~ =abase rate of $273 plus land use. The rate for a single footprint <3,000 sq. ft. _ <br /> ~ $0.066 per square foot of residential unit is $367.69. $540.96, or 23,000 sq. ft. _ <br /> ~ living area. Residential $811.44. Per duplex = <br /> additions will be charged $1,081.92. For manufactured <br /> $0.066 per square foot of ~ home parks = $282.91 per spac <br /> increased living area. - plus cost per square. <br /> Non-residential uses foot of additional impervious <br /> _ $2.07 per gallon of daily area = $0.168. <br /> flow/discharge. <br /> Non-assessable Estimated non-assessable The reimbursement portion of the Estimated non-assessable Unit costs for <br /> N cost per lane mile cost of existing system charge is based on the net local cost of existing system using various <br /> ~ for collectors and using costs from "Gravity equity in the regional treatment plant costs from "Infrastructure components. <br /> m arterials; costs of Sewer Lines System and other regional assets. The Replacement Values Report". <br /> N arterial street lights; Valuation Model" developed improvement portion of the charge is <br /> ~ cost per mile for by CH2M Hill. Charges based on current cost of capacity- <br /> U off-street bic cle are net of all federal rants enhancin <br /> y g g projects to be constructe <br /> paths. and outstanding debt. as contained in the current Capital <br /> Improvement Program. <br /> ~ Level of Service Design flow standards The service standards are seconda Design standards currently use Existing levels <br /> "D" for roads (675 currently used by the City wastewater treatment by the City to handle afive-year of service for <br /> ~ peak hour vehicles for various land use types. for flows as defined in MWMC's storm. various <br /> ~ per lane). One light PFUs are determined operating permit with DEQ, and components, <br /> N per 27 peak hour using Oregon State capacity enhancing capital as established <br /> ~ VMT. 0.2268 miles Drainage Plumbing Code. improvements as listed in the capital in the Eugene <br /> ~ of off-street bicycle improvements plan adopted Parks and <br /> ~ path per 1,000 by the MWMC. Recreation <br /> ~ people. Plan. <br /> Improvement Reimbursement charge The MWMC charge is a combined Improvement charge. Improvemen} <br /> ~ charge. ~ 84% reimbursement and improvement fe charge. <br /> o The proportion of the fee that is <br /> ~ Improvement charge based on capacity enhancing <br /> v ~ D 16% improvements varies over time as <br /> <br /> N~ projects are identified, funded, and <br /> NV scheduled. <br /> <br /> V Charges for roads New or expanding Charges for new development, Basic SFD dwelling unit cost is Charges are <br /> and streetlights residential uses are changes in use and existing computed based upon assumed based on a <br /> would be calculated charged based on a per development connecting for the first 35% impervious area on 9,200 flat rate per <br /> based on trip rates dwelling unit cost plus a time are based on the number of Flo square foot lot. For SFDs with dwelling unit <br /> for specific rate per square foot of Estimation Units (PFUs), times the 23,000 sq. ft., the cost is based for all types <br /> development types living area. Non-residential cost per unit of measure. A FEU is upon 1.5 times the basic SFD of residential <br /> = according to uses are charged based on based on the size of development, rate. For duplex development, development. <br /> ~ Appendix B, using the number of PFUs at a and the effluent characteristics of the cost is based on 2 times the There is no <br /> a dwelling units, gros rate for the specific flow, biochemical oxygen demand basic SFD rate). The cost charge for <br /> ~ floor area, or other development type and suspended solids for each type for a manufactured home park commercial <br /> ~ units. Trip rates according to Table 4, Page of land use. The charge for changes is computed based on assumed development. <br /> d capped at 10 trips C-4. Credit for past trunk in use and expansion of developmen 1,684 sq. ft. of impervious area <br /> Q- per 1,000 square sewer levy payments will be already connected to the wastewate per space plus the additional <br /> ~ feet or equivalent. applied to the local charge. system are based on the net cost per square foot of all other <br /> difference in FEUs created by the impervious surface area. All <br /> change or expansion. Credit for pas other development is charged <br /> property tax payments for debt based on actual impervious <br /> service on the regional facilities will surface area or equivalent <br /> be deducted from the charge. surface area. <br /> Note: Administration costs are not included in the figures above; see section 2.3.1 for more information. <br /> City of Eugene SDC Methodology Page 4 <br /> <br />