. ' ~ THIS PA E PROPOSED <br /> METHODOLOGY: <br /> '',i City of Eugene Systems Development Charges <br /> Appendix F <br /> ~ Fee Schedule and Formulas <br /> 1.0 Form la and Calculation Details <br /> 1.1 eneral Rate Setting, Cost of Service Formula: <br /> SDC eligible costs <br /> = SDC per unit of service <br /> Impact Measurement <br /> 1.2 ransportation System Cost of Service [add cost per trip for: street system ($539.05) <br /> street system lighting ($138.42) + bicycle path system ($68.66) + bicycle path system <br /> I ghting ($8.50) =total cost per trip ($754.63]: <br /> .2.1 Street System Cost of Service <br /> ormula: <br /> Miles per trip <br /> X Cost per lane mile = Cost per trip <br /> Capacity per lane mile <br /> alculation: <br /> 0.7665 <br /> X $474,701. _ $539.05 (per trip) <br /> 675 <br /> .2.2 Street Light System Cost of Service <br /> ormula• <br /> Miles per trip <br /> X Cost per light = Cost per trip <br /> Capacity per lane mile <br /> <br /> i <br /> alculation: <br /> 0.7665 <br /> i X $4,876 = $138.42 (per trip) <br /> 27 <br /> City of Eug ne SDC Methodology Fee Schedule & Formulas, Page F-1 <br /> <br />