2.3 Cha a of Use <br /> When a c ange of use of an existing development results in an increased impact on the regional <br /> <br /> ,I wastewat facilities (as demonstrated by calculating the SDC for both uses), the SDC will be charged on <br /> the increa ed impact. This is determined by calculating what the development's charge would be for the <br /> current us ,and for the proposed use. If the proposed use would result in a higher charge, the difference <br /> is collecte . <br /> 2.4 MW C Wastewater SDC Credit <br /> A credit fo property taxes on real property paid to retire bonded debt incurred for the construction of <br /> regional w stewater facilities shall be deducted from the MWMC wastewater SDC. The credit shall accrue <br /> from they ar of annexation to the City, and be based upon the assessed value of the real property at the <br /> time of ap lication for connection to the system. The current credit is shown in Attachment 3. <br /> 2.5 MW C Wastewater Administrative Charge <br /> I A further a justment to the MWMC wastewater SDC is the addition of administrative costs. MWMC will <br /> incur staff osts for the updating and processing of the charge. These costs are applied orE a per <br /> connectio basis. The MWMC wastewater administrative charge per permit is applied to the total SDC <br /> fees after II other charges and credits have been applied. <br /> Attachment 3 <br /> Re Tonal MW,MC Wastewater SD`GCredit Rates <br /> For Fiscal Year 2002 Credit, effective July 2, 2001 <br /> Year of Credit per $1,000 Year of Credit per $1,000 <br /> nrLexation Assessed Value Annexation Assessed Value <br /> 1979 $4.92 1990 $2.06 <br /> 1980 $4.83 1991 $1.64 <br /> 1981 $4.77 1992 $1.45 <br /> 1982 $4.64 1993 $1.31 <br /> 1983 $4.47 1994 $1.13 <br /> 1984 $4.30 1995 $0.97 <br /> i 1985 $4.09 1996 $0.82 <br /> 1986 $3.78 1997 $0.63 <br /> 1987 $3.41 1998 $0.41 <br /> 1988 $2.98 1999 $0.22 <br /> 1989 $2.52 2000 $0.04 <br /> i <br /> City of Eug ne SDC Methodology Wastewater, Page C-11 <br /> <br />