New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-01-11-F
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-01-11-F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 3:35:36 PM
Creation date
8/14/2008 10:07:16 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
SDC Methodology
Document_Date
6/29/2001
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TABLE 4 <br /> Local Wastewater Systems Development Charge Analysis <br /> 1. Analysis of System Value <br /> Total Replacement Cost -Pipe $380,597,036 <br /> Total Replacement Cost -Pumping Stations $14,529,257 <br /> City Cost of future projects within UGB $9,097,880 <br /> Other Wastewater Components $2,982,222 <br /> Total Cost of Existing Wastewater System $407,206,394 <br /> 2. Analysis of Assessable Amount <br /> Size Total Cost <br /> 6-inch $8,647,587 <br /> 8 to 48-inch $287,757,173 <br /> Total Assessable Cost $296,404,760 <br /> 3. Capacity Information <br /> Total City""System Capacity 48:9 mgd <br /> 4. Calculation of Wastewater SDC <br /> Total System Valuation, existing and planned $407,206,394 <br /> Cost per unit of capacity per gallon $2.07 <br /> Residential Rate Structure $273 per RDU + $0.066 per sq. ft. of living area <br /> Non-Residential Rate Structure See Table 4A <br /> 5. Calculation of Reimbursement Percentage <br /> City System Capacity (EDUs) 48.9 mgd 100.00 percent <br /> Existing Use 21.4 mgd 43.76 percent <br /> Percent Available for New Development 27.5 mgd 56.24 percent <br /> Total Value of Reserve Capacity (value of system) $56,943,264 100.00 percent <br /> Value of Increased Capacity (cost of future projects UGB-Master Plan) $9,097,776 15.98 percent <br /> Value of Reimbursable Capacity (previously paid value-existing users) $47,845,488 84.02 percent <br /> <br /> City of Eugene SDC Methodology Wastewater, Page C- 4 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.