FIGURE 2 <br /> TRANSPORTATION SYSTEM <br /> STREETS <br /> Level of Service <br /> LOS D as specified System Value <br /> in TransPlan <br /> Impact Measurement Non-assessable <br /> construction cost <br /> D Trips generated per lane mile <br /> D Vehicle mile traveled <br /> Formula: <br /> Cost of Service (PER TRIP) <br /> Miles per trip <br /> X Cost per = Cost per <br /> Capacity per lane mile lane mile trip <br /> Note: The cost per trip, can be found in the current adopted SDC fee schedule in <br /> Appendix F. <br /> <br /> City of Eugene SDC Methodology Transportation, Page B- 4 <br /> <br />