New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-02-04
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-02-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 3:36:42 PM
Creation date
8/13/2008 3:46:47 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
Rasor Park
Document_Date
9/4/2002
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Strateav 1: Install waste receptacles and park signs. (high priority) <br /> 1.1 Immediately install park identity signs, dog waste facilities, and garbage receptacles near the <br /> curb cut on River Road and near the bikepath. Lower the bikepath sign at the Stephen's <br /> Drive entrance so that it has human scale. <br /> 1.2 Consider installing additional signs at the same locations, or attached to the park identity <br /> sign, explaining the new vision and mission of the park and invite volunteers to participate in <br /> restoration projects. Avoid proliferation of signs throughout the park. <br /> Strateav 2: Install park benches and picnic tables in strategic locations, (high <br /> priority) <br /> 2.1 Install a couple of park benches along the mowed savanna-prairie paths, and a couple of <br /> picnic tables near the bikepath as indicated on the concept plan, and at the edge of the mowed <br /> area, <br /> 2.2 Consider natural seating in the unmowed areas, using river stones or split logs. <br /> 2.3 Place large river stones for sitting at the top of the revetment in the open area near the <br /> apartments on the north end of the park. <br /> Strateav 3: Implement screening and buffering elements of the design. (high <br /> priority) <br /> 3.1 As a high priority and integral part of the planting plan prescribed in Section 7.2, Strategy <br /> 1.2, work with volunteers to continue planting native trees and shrubs along the park edges <br /> and especially adjacent to the southern boundary, while maintaining the fire protection strip. <br /> 3.2 As a part of the screening and buffering project, define the mowed open space with <br /> naturalistic clusters of trees and varying canopies near the Graffiti Alley property, in <br /> association with the community gathering place, around the park staging area (NW corner of <br /> the mowied area), and around the "sacred space" in the southeast corner of the park. <br /> 3.3 Placement of trees will be carefully planned to preserve the open space and extended views <br /> through the park. <br /> Strateav 4: Develop a design theme and specifications for the interpretive and <br /> environmental education program to promote restoration, rehabilitation, and <br /> enhancement goals of the plan. <br /> 4.1 Develop an interpretive plan for the park, and design and install interpretive facilities <br /> including signs, wayside exhibits, and information kiosks. <br /> I <br /> Rasor Park Master Plan 26 City of Eugene, Parks Planning <br /> i <br /> <br /> i <br /> <br /> i <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.