New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-02-25-F
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-02-25-F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 3:38:50 PM
Creation date
8/13/2008 2:27:07 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
Geological Analysis Standards
Document_Date
3/31/2002
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
f <br /> <br /> i <br /> 1 <br /> the proposed deviation shall be based upon evidence that the deviation request meets all of the <br /> k following criteria: <br /> G <br /> 3.1 The alternate investigation method will achieve the intended result through <br /> a comparable or superior design; <br /> 3.2 " The alternative will not adversely affect public safety and/or operation of the <br /> r structure; and <br /> 3.3 ~ The alternative will not adversely affect maintainability of the structure. <br /> R-9.6710-J Construction Verification. <br /> I <br /> A qualified geotechnical professional must be retained to verify subsurface conditions during <br /> ! the construction phase for prof ects requiring a Level 3 analysis. The City must approve anyone other ' <br /> <br /> ~ r than the Qualified Registered Professional of record to observe construction. Construction <br /> verification requires penodic observations ofthe construction site mainly during excavation/drilling <br /> or other subsurface work for the pmject. A log/report must be submitted to the City showing: <br /> 1. Date(s) and time(s) of site visit. <br /> 2. Name of professional. <br /> ~I <br /> 3. Short list/description of soiUrock units and water conditions observed. <br /> ~ 4. Consistency of observations with the findings and recommendations made in the <br /> k Leve12 or Leve13 report. <br /> 5. Inconsistenciesthat are encountered with a discussion of their impact on the project <br /> design along necessary changes, if any, and/or impact on project feasibility, if any. <br /> E <br /> f Public notice of this proposed adoption of Standazds for Geological and Geotechnical <br /> Analysis Administrative Rule R-9.6710 shall be given by making copies thereof available to any <br /> person who has requested such notice and by publication thereof in the Register Guazd, a newspaper <br /> j of general circulation within the City for at least five consecutive days; providing interested persons <br /> ~ an opportunity of not less than 30 days to submit data or comments thereon. I will thereafter adopt <br /> Standards for Geological and Geotechnical Analysis Administrative Rule R-9.6710 as contained <br /> ~ herein or as revised in response to comments received, which will become effective immediately <br /> thereafter. <br /> Dated tliis•~~`- day of , 2002. <br /> I <br /> /C~ <br /> James .Carlson <br /> City Ma ager pro tem <br /> i <br /> Administrative Order - 15 <br /> r:l~droinord\rules\02gcotech l ao.wpd(09/05/02) <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.