New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-02-29-F
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-02-29-F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 3:39:07 PM
Creation date
8/13/2008 2:14:27 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
Utility ROW Permit Fees
Document_Date
2/18/2002
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
'~k ?i <br /> NOTICE OF INTENDED AMENDMENT OF <br /> UTILITY RIGHT-OF-WAY USE PERMITS FEES <br /> <br /> i'I <br /> To: The Mayor and City Councilors of the City of Eugene, and other interested persons. <br /> NOTICE IS HEREBY GIVEN that pursuant to the provisions of Sections 2.020 and 7.300 <br /> ' of the Eugene, Code, 1971, the City Manager pro tem of the City of Eugene intends to amend the <br /> <br /> ~ fees for Utility Right-of--Way Use Permits, to add a new section entitled "Major Aerial Installation <br /> Permit Fee," as follows: <br /> <br /> i <br /> <br /> i <br /> UTILITY RIGHT-OF-WAY USE PERMIT FEES <br /> (Effective upon signature of final Administrative Order) <br /> Current Fee Proposed Fee <br /> III Major Aerial Installation Permit Fee: None See below . <br /> If the activity to be permitted on an individual permit involves a primarily aerial installation <br /> only and exceeds 26,400 feet (5.0 miles), the permit fee shall be computed in two steps, as follows: <br /> ' Step One. The initial 26,400 feet (5.0 miles) shall be permitted under the existing site <br /> specific permit fee contained in Section II. <br /> Step Two. All additional footage over 26,400 feet (5.0 miles) shall be computed at the rate <br /> of $ 0.10 cents per foot. This rate shall be applicable for the calendar years of 2002 and 2003. <br /> Primarily aerial installations only that are less than 26,400 feet and not specifically authorized under <br /> a blanket permit remain subject to the site specific permit fees of Section II of this schedule. <br /> For purposes of this section, "primarily aerial installation" is the installation of wire or cable <br /> ;type facilities on existing poles or approved above-ground structures. The installation or <br /> <br /> j 'replacement of pole anchors may be approved as part of an aerial installation pemut as long as the <br /> installation is completed within a radius of 10 feet from the existing pole or structure. Other <br /> ,ancillary equipment and underground facilities shall not be considered aerial components under this <br /> <br /> ~ Schedule and as such shall require a separate site specific permit under Section II of this Schedule. <br /> In addition to these requirements, all aerial activities shall comply with the standards contained <br /> within the Utility and Right-of--Way Permits Construction Within and Use of the Public Way <br /> Policies and Procedures Manual, and other applicable documents. <br /> The fee as proposed above is intended to provide an equitable fee for major activities that <br /> Notice - Exhibit A - 1 <br /> r:\adminord\fees\02utilrownotwpd(09/16/02) <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.