New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-04-04-F
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-04-04-F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 3:41:01 PM
Creation date
8/13/2008 11:36:50 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
Local Wastewater, Stormwater, Transportation Fees
Document_Date
3/24/2004
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TABLE 1 <br /> SUMMARY OF SYSTEMS DEVELOPMENT CHARGES <br /> Transportation Wastewater Local (City) Wastewater -Regional (MWMC) Stormwater Parks <br /> Cost per trip = Cost per new residential unts Costs are based on the type of land use Total stormwater unit cost per Cost per Dwelling <br /> $1,363.66 (e.g., single-family, mobile and, for industrial dischargers with sq.ft. of impervious surface Unit = $1,344.65 <br /> home parks, duplexes, process flows, on the strength of Area = $0.148. Charges are <br /> apartments) =abase rate of discharge. The rate varies by land use. based on use. 1-2 Family <br /> $297.92 plus $0.0722 per The rate for a single Residential unit is development under 3,000 sq.ft <br /> square foot of Irving area. $528.86. have tiered rates based on <br /> Residential additions will be est. imp. surface areas. 1-2 <br /> N charged $0.0722 per square Family over 3,000 sq.ft. and <br /> a; foot of increased living area. Multi-Family & Nonresidential <br /> ~ Non-residential uses = <br /> are based on actual imp. <br /> $2.2572 per gallon of daily surface area. Charges for Mfg. <br /> flow/discharge. Home Parks are based on est. <br /> imp. surface area per space <br /> plus actual impervious surface <br /> - .area of additional common <br /> area. <br /> Estimated costs of Estimated non-assessable The reimbursement portion of the charge Estimated non-assessable Unit costs for <br /> arteriaUcollector ~ cost of existing system using is based on the net local equity in the cost of system-wide capacity various <br /> Street system (non costs from "Gravity Sewer regional treatment plant and other from future capacity- components. <br /> r?r assessable cost per Lines System Valuation regional assets. The improvement portion enhancing projects as <br /> .y lane-mile, costs of Model' developed by CH2M of the charge is based on current cost of contained in the Stormwater <br /> R <br /> m intersections, traffic Hill. Charges are net of all capacity- enhancing projects to be SDC Project List and available <br /> ~ signals, street lights, federal grants and constructed, as contained in the current existing stormwater system <br /> ~ structures) and off outstanding debt. Capital Improvement Program. capacity. <br /> rJ street bicycle paths. <br /> Existing levels of Design flow standards The service standards are secondary Design standards currently Existing levels of <br /> service for various currently used by the city for wastewater treatment for flows as defined used by the City to handle a service for various <br /> ev components as various land use types. PFUs in MWMC's operating permit with DEQ, Five-year storm. components, as <br /> ~ established by equivalents are determined and capacity enhancing capital established in <br /> N current City per Oregon adopted Plumbing improvements as listed in the capital Eugene Parks & <br /> transportation design Code. improvements plan adopted by the Recreation Plan. <br /> standards. MWMC. <br /> d <br /> y <br /> ~ Street Component: Reimbursement fed The MWMC charge is a combined Reimbursement fee Improvement fee <br /> o d Reimbursement fee ? 84% reimbursement and improvement fee. ? 47°~ <br /> ~ ~ ? 40°~ Impr. Fee The proportion of the fee that is based on <br /> t ? 60% Reim. Fee Improvement fee capacity enhancing improvements varies Improvement fee <br /> 'us U Bike Component: ? 16% over time as projects are identified, ? 53% <br /> ~ p ? 100% Impr. Fee funded, and scheduled. <br /> U <br /> Charges for new or New or expanding residential Charges for new development, changes in Charges for new (all) or Charges are based <br /> expanding uses are charged based on a use and existing development connecting expanding (Multi-family, on a flat rate per <br /> development are per dwelling unit cost plus a for the first time are based on the number Nonresidential) development dwelling unit for all <br /> based on the cost rate per square foot of living of Flow Estimation Units (PFUs), times are based on estimated or types of residential <br /> per trip times the trip area. Non-residential uses are the cost per unit of measure. A FEU is actual impervious surface development. There <br /> rate assigned fora charged based on the number based on the size of development, and areas and the total stormwater is no charge for <br /> ~ specific development of PFUs at a rate for the the effluent characteristics of flow, unit cost per square foot. commercial <br /> 0 <br /> ' <br /> ~ type times the speck development type. biochemical oxygen demand and Stormwater impact not development. <br /> ~ number of units of Credit for past truck sewer suspended solids for each type of land attributable to impervious <br /> ~ measurement levy payments will be applied use. The charge for changes in use and surface area will be charged <br /> ~ proposed. to the local charge. expansion of development already based on equivalent surface <br /> fl, connected to the wastewater system are area and the total stormwater <br /> E based on the net difference in FEUs unit cost per square foot. <br /> created by the change or expansion. <br /> Credit for past property tax payments for <br /> debt service on the regional facilities will <br /> be deducted from the charge. <br /> <br /> Note: Administration costs are not included in the figures above, see section 2.3.1 for more information. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.