New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-04-04-F
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-04-04-F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 3:41:01 PM
Creation date
8/13/2008 11:36:50 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
Local Wastewater, Stormwater, Transportation Fees
Document_Date
3/24/2004
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Formulas for Non-Residential Development <br /> Non-Assessable System Valuation <br /> Value of existing + Value of planned) = Cost per unit of capacity <br /> Build-out capacity (mgd) <br /> Per unit of capacity X flow per PFU for development type X number of PFUs <br /> for development =SDC for development <br /> Calculations for Non-Residential Development <br /> $100,676M + 9,925M <br /> _ $2.2572 per gallon per day <br /> 49.0 mgd <br /> $2.2572 X Gallon per PFU (varies by development type) X <br /> Number of PFUs =SDC for development <br /> 1.3.2 Regional (MWMC) Wastewater System Cost of Service <br /> General Formulas <br /> Existing and increased plant local <br /> equity related to average flow <br /> = Cost per gallon of average daily flow <br /> Average daily design flow <br /> Existing and increased plant local <br /> equity related to peak flow Peak flow <br /> X =Cost per peak daily <br /> Peak flow Ave. daily design flow capacity per gallon <br /> of average daily flow <br /> <br /> City of Eugene SDC Methodologies Fee Schedule & Formulas, Page F-4 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.