Formulas for Non-Residential Development <br /> Non-Assessable System Valuation <br /> Value of existing + Value of planned) = Cost per unit of capacity <br /> Build-out capacity (mgd) <br /> Per unit of capacity X flow per PFU for development type X number of PFUs <br /> for development =SDC for development <br /> Calculations for Non-Residential Development <br /> $100,676M + 9,925M <br /> _ $2.2572 per gallon per day <br /> 49.0 mgd <br /> $2.2572 X Gallon per PFU (varies by development type) X <br /> Number of PFUs =SDC for development <br /> 1.3.2 Regional (MWMC) Wastewater System Cost of Service <br /> General Formulas <br /> Existing and increased plant local <br /> equity related to average flow <br /> = Cost per gallon of average daily flow <br /> Average daily design flow <br /> Existing and increased plant local <br /> equity related to peak flow Peak flow <br /> X =Cost per peak daily <br /> Peak flow Ave. daily design flow capacity per gallon <br /> of average daily flow <br /> <br /> City of Eugene SDC Methodologies Fee Schedule & Formulas, Page F-4 <br /> <br />