i <br /> a ~ TABLE 6 <br /> (Page Replaced) <br /> ocal Wastewater System Development Charge Analysis <br /> . Analysis of stem Value <br /> otal Re taceme t Cost -Pie $46~4?39A <br /> otal Re laceme t Cost - Pum in Stations , <br /> i Cost of futur ro'ects within UGB , <br /> ther Wastewate Com nests - , <br /> i <br /> j .Anal sis of ssessable Amount <br /> ize Total Cost <br /> inch <br /> to 48-inch <br /> A <br /> . Ca acity inf rmation <br /> . Calculation f Wastewater SDC , <br /> otal S stem Valu tion, existi and tanned ~ , <br /> st r unit of ca aci r altos <br /> Calculation Reimbursement Percentage <br /> ' S stem Ca a EDUs in m 49.0 100.00% <br /> E isti Use in m 21.4 43.7% <br /> P rcent Available f r New Develo ment in m 27.6 56.3% <br /> tat Value of Res rve Ca c' value of s stem $6+9 100.00% <br /> <br /> ~r <br /> fCity of Eugen SDC Methodologies Wastewater <br /> <br />