|
i
<br /> TABLE 9
<br /> Stor water Drainage Systems Development Charge Analysis
<br /> 1. xisting Storm ater Drainage System Value &SDC-Eli ible Costs (Reimbursement Fee)
<br /> Total Re laceme t Cost -Existin Pi e S stem $255,831,618
<br /> Total Re laceme t Cost -Existin O en Channel S stems $73,128,022
<br /> Y.
<br /> ,e a..:,. t:..... ry,, .
<br /> 1l~ p
<br /> a. : iK.. f ems.
<br /> Percent of Existin Pi e S stem to be Used b New Develo ment 4.27%
<br /> Percent of Existin O en Channel s stem to Used b New Develo ment 2.34%
<br /> otal SDC-Eli ibl Cost -Existin Pi e* $10,924,011
<br /> ~fotal SDC-Eli ibl Cost -Existin O en Channel S stems* $1,711,196
<br /> r :
<br /> ~ < L
<br /> d„ .
<br /> i
<br /> uture Stormw ter System SDC-Eli ible Project Costs (Improvement Fee)
<br /> o:.w., ~ . .
<br /> .....r., , ...,.Fri.,. -j,T;~,
<br /> ~f F
<br /> w~' fir,, ~ . ~ ~'~~""r~.: 4
<br /> tormwater S tem Calculation Details
<br /> Sin le-Famil Dw Ilin SFD ,estimated avera a im ervious surface area
<br /> Small Resid nt[al (building footprint <1,000 sq. ft.) 1,800 s . ft.
<br /> Medium Res dential (buildin footprint >1,000 sq. ft. and < 3,000 sq.ft. 2,900 s . ft.
<br /> Mf .Home Park ace, estimated avera a im ervious surface area 1,780 s . ft.
<br /> ,tx,.-, . ..r ;w. ' ,A . sad' '9y~- a yi ~ v.. .
<br /> ,u+~we t ;y~.
<br /> ie.;{,..r.. .F F
<br /> alculation of DC*
<br /> Unit Cost er S are Foot, Im rovement Fee [$13612,741 / 155,770,560 $0.0893
<br /> Unit Cost er S are Foot, Reimbursement Fee [$12,635,207 / 155,770,560 $0.0811
<br /> .
<br /> .
<br /> . ,
<br /> Small Residentia SDC (building footprint < 1,000 sq. ft.) [1,800 s . ft. x $0.170 $306.00
<br /> Medium Res[den ial SDC buildin footprint >1,000 s . ft. and < 3,000 sq.ft. [2,900 sq.ft x $0.170 $493.00
<br /> Small Du lex SD (unit building footprints < 1,000 sq. ft.) $306.00 x 2 $612.00
<br /> Medium Du lex DC (unit bulldln foo rints >1,000 s . ft. and < 3,000 s .ft. $493.00 x 2 $986.00
<br /> Mf .Home Park DC er S ace ortion of total char a [1,684 sq. ft. x $0.170] $286.28
<br />
<br /> *$e Appendix F for c mplete rate schedule.
<br /> City of Eugen SDC Methodologies Stormwater, Page D-5
<br /> i
<br />
<br />
|