' TABLE 6 <br /> Local Wastewater System Development Charge Analysis <br /> 1. Analysis of System Value <br /> Total Re lacement Cost - Pi $476,881,204 <br /> otal Re lacement Cost - Pum in Stations $18,204,8 <br /> Ci Cost of future ro'ects within UGB $11,399,479 <br /> Other Wastewater Com vents $3,736,671 <br /> 2. Analysis of Assessable Amount <br /> Size Total Cost <br /> 6-inch $10,835,271 <br /> to 48-inch $360,554,535 <br /> 3. Capacity.lnformation <br /> 4. Calculation of Wastewater SDC <br /> otal S stem Valuation, existin and tanned $510,222,25 <br /> Cost r unit of ca aci r allon $2.5924 <br /> 5. Calculation of Reimbursement Percentage <br /> Ci S stem Ca aci EDUs in m d 49.0 100.00% <br /> Existin Use in m d 21.4 43.7% <br /> <br /> Percent Available for New Develo meat in m 27.6 56.3% <br /> otal Value of Reserve Ca aci value of s stem $71,348,881 100.00% <br /> City of Eugene SDC Methodologies Wastewater. <br /> <br />