Ili <br /> _ ! <br /> i <br /> September 21, 2007 <br /> ~ CONTACT; Patrick Cox, Project Manager, 541-682-6854 <br /> From Publid Information Section, 682-5523 or 954-2938 <br /> FOR IMMEDIATE RELEASE <br /> i <br /> i <br /> ~i <br /> I Scheduled to Be in Monda <br /> Repairs at Broadway and Willamette g y <br /> Iii Work is scheduled to begin Monday, Sept. 24, on a project to replace the bricks on <br /> I <br /> II Broadway. ' <br /> I, ~ The $144,000 project includes removing the failed brickwork on Broadway in the vicinity of <br /> Willamette Street and replacing it with continuously reinforced decorative concrete. Brown <br /> j <br /> ~ Contracting of Eugene will do the work. The project is being managed by the Eugene Public <br /> j Works Engineering Division in consultation with Scott Wylie, the artist who originally designed the <br /> Broadway Plaza area. <br /> The. work is scheduled to take about four weeks to complete. For the first two weeks, <br /> Broadway Mrill be closed to through traffic between Oak and Willamette streets. Then the work will <br /> i <br /> III shift to the yvest side of Willamette, and Broadway will be closed between Willamette and Olive <br /> streets. <br /> III Sidewalks and business access will remain open at all times. <br /> ill For updates on this project and other local roadwork, call the Metro Roadwork Hotline at <br /> 984-8484, or on the web at www.eugene-or.gov/traffic. <br /> I <br /> <br /> III <br /> I <br /> • <br /> Eugene Public Works www.eugene-or.gov/pw <br /> 858 Pearl Street, Eugene, Oregon 97501 • 541-682-5523 • fax 541-682-6826 • e-mail pwadmin@ci.eugene.or.us <br /> <br />