New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 03 Summary
COE
>
PW
>
Admin
>
Public Affairs
>
2004
>
FY 03 Summary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2010 3:20:57 PM
Creation date
8/6/2008 11:15:17 AM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PWE De k slabs to be placed for four new bridges for the Fern Ridge path 08/15/02 CCN <br /> in est Eugene <br /> PWE Tr ffic signal at Willamette and Crest im roves safety at intersection 08/22/02 CCN <br /> PWE Oli e Street to reo en at Broadway on Friday, August 30 08/29/02 NR <br /> PWE Oli e Street to reopen at Broadway on Friday afternoon 08/29/02 CCN <br /> PWE E t bank bike path stays on track des ite detour 09/01/02 CLIP <br /> PWE Ea t bank bike ath stays on track des ite detour 09/01/02 CLIP <br /> PWE Bl e bike lane directs cyclists on River Road 09/05/02 CCN <br /> PWE Ro d projects finish in time for start of classes in Bethel School 09/05/02 CCN <br /> <br /> ~ Di trict <br /> PWE De to onds restoration roject moving ahead to corps regional review 09/05/02 CCN <br /> PWE Wi lamette Street closed between 8 and 10 Avenues Sept. 9-22 09/06/02 NR <br /> PWE Ro d re airs scheduled on Bertelsen Road at Roosevelt Boulevard 09/12/02 NR <br /> PWE Co struction progresses on two bike ath projects 09/12/02 CCN <br /> PWE Co ute challenge returns 09/12/02 CCN <br /> PWE Ro d re airs scheduled on Bertelsen Road at Roosevelt Boulevard 09/12/02 CCN <br /> PWE Co test turns long commute into diversion 09/17/02 CLIP <br /> PWE Se in traffic is believing -cars cruise Broadway downtown 09/24/02 CLIP <br /> PWE G 'rl delivers bicycle safety message 09/25/02 CCN <br /> <br /> ' PWE O ober 4 Broadway dedication features arade, speakers, fun events 09/30/02 NR <br /> PWE W rk starts Monday on Tugman Creek Storm water Project 10/03/02 CCN <br /> PWE C mute challenge 10/03/02 CLIP <br /> PWE W rk on Tugman Creek delayed until 2003 10/04/02 NR <br /> ~I PWE W rk starts Monday on Tugman Creek Storm water Project 10/04/02 NR <br /> PWE B sinesses win awards for using alternatives to driving alone 10/10/02 NR <br /> PWE A es Road remodel from Delta Highway re awed 10/13/02 CLIP <br /> PWE N traffic signal activated at intersection of Royal and Terry 10/15/02 NR <br /> PWE T an Creek Project delayed until drier weather next construction 10/17/02 CCN <br /> se son <br /> PWE St ff to receive FEMA training in floodplain management and flood 10/31/02 CCN <br /> h and areas <br /> .PWE Bi e/ped ath's currently under construction in the city of Eugene 11/08/02 NR <br /> PWE Ri bon-cutting today to open new lane on I-105 at Delta Hwy 11 /22/02 NR <br /> PWE Si al will calm south-side corner 11/27/02 CLIP <br /> PWE Cr ws replace green signal bulbs, lighted street signs to conserve 11/28/02 CCN <br /> <br /> ~ en rgy <br /> PWE St eet changes to enhance new library access 12/05/02 CCN <br /> ~ PWE St to releases latest traffic crash report for Eugene streets 12/12/02 NR <br /> PWE St to releases latest traffic crash report for Eugene area streets 12/12/02 CCN <br /> PWE Ci y receives funding authorization for pedestrian improvements 12/12/02 CCN <br /> PWE A fewer crashes just an accident? 12/13/02 CLIP <br /> PWE A fewer crashes just an accident? 12/15/02 CLIP <br /> PWE Tr ns ortation study underway with neighbors in Crest Drive area 01/16/03 CCN <br /> PWE C mpletion of safety features allows "soft opening" of Fern Ridge 01/16/03 CCN <br /> pa h extension <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.