New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN 4899 ODOT Overcharge
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2017
>
GJN 4899 ODOT Overcharge
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2017 3:15:58 PM
Creation date
9/21/2017 3:15:57 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Admin Documents
PW_Active
Yes
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TOTAL = $20,174.68 <br /> <br /> <br />Small disclaimer: I reserve the right to change this number at any time if my boss says so <br /> <br /> <br />Thanks Jon! <br /> <br />Bryan <br /> <br />BRYAN D. ROOT, P.E. <br /> <br /> <br />Associate Engineering Technician <br /> <br /> <br />City of Eugene Public Works Engineering <br /> <br /> <br />99 E. Broadway, Suite 400 Eugene OR 97401 <br /> <br />Cell 541.501.0378 <br /> <br />Office 541.682.5300 <br /> <br /> <br />_____________________________________________ <br />From: ROOT Bryan D <br />Sent: Thursday, June 16, 2016 9:57 AM <br />To: THOMAS Jon (Jon.Thomas@EWEB.ORG) <Jon.Thomas@EWEB.ORG>; IRVIN Christopher <br /><Christopher.Irvin@EWEB.ORG> <br />Cc: COX Patrick M <Patrick.M.Cox@ci.eugene.or.us> <br />Subject: South Bank Path Bids <br /> <br /> <br />Morning Jon & Chris, <br /> <br />I wanted to let you know that we have opened the bids for South Bank Path. Of the items that EWEB agreed to finance <br />here is the breakdown: <br /> <br />ITEM TOTAL QTY EWEB QTY UNIT $ TOTAL COST EWEB COST <br />Stone Embankment 2,400 TN 720TN $36.23/ ton $86,952.00 $26,085.60 Elec. <br />Adjust Boxes 1 EA 1 EA $550.00/ EA $550.00 $550.00 Water <br />12 Inch Thick Fiber and Bar Reinforced Concrete 1,296 SF 583.2 SF $13.05/ <br />SF $16,912.80 $7,610.76 Water <br /> Sub-Total $34,246.36 <br />Contingency (3.5%) $1,198.62 <br />Engineering $2,657.00 <br /> <br /> TOTAL $38,101.98 <br /> <br />I realize this is higher than we originally anticipated, but the silver lining is we don’t have to move the power pole and <br />the underground water main will be safe <br /> <br /> <br />Please let me know that you have received and agree with the information above. <br /> <br />Thank you for all your help throughout the design process! <br /> <br />Bryan <br /> <br />BRYAN D. ROOT, P.E. <br /> <br /> <br />Engineering Associate (AIC) <br /> <br /> <br />City of Eugene Public Works Engineering <br />3 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.