New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Fleet Facility
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
Fleet Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2010 10:00:20 AM
Creation date
8/6/2008 9:49:50 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Fleet
PWA_Project_Area
Execs
PW_Subject
Fleet Facility
Document_Date
9/26/2008
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Fleet Maintenance Facility <br /> Financing Meeting Minutes <br /> Meeting Date/Time: August 15, 1:30 PM <br /> Attendees: Jim Carlson, Becky Carlson, Kurt Corey, Sue Cutsogeorge, Carlos Davis, Jeff <br /> Lankston, Kitty Murdoch, Lacey Risdal, Glen Svendsen <br /> 1. Introduction/Purpose of the Meeting <br /> a. Preliminary discussion about project financing possibilities <br /> b. Info to help with programming <br /> c. Consider possibility of FY08 rate increase to build up construction fund <br /> 2. What are all the potential project costs and is there a rough range of possible costs? <br /> The project costs won't be determined until the programming exercise is complete and the <br /> scope of the project has been developed. For planning purposes, the preliminary range of <br /> possible project costs is $10 to $15 million. <br /> Fleet/Facilities is in the process of developing an RFP to choose a consultant to help with a <br /> programming exercise. The scope of the project will include: <br /> a. Replace current facility/size <br /> b. Consider including room for future growth, either up front or as part of a phased <br /> development plan _ <br /> <br /> . c. Possible size of building is 40,000 to 50,000 square. feet, including the radio shop <br /> d. Fueling station (possibly joint with other agencies) <br /> Some possible costs/items to take into account are: <br /> a. Site work/demo of existing structures/environmental rernediation <br /> b. Construction <br /> c. Furnishings, fixtures and equipment, including specialized equipment, such as <br /> overhead cranes and hoists <br /> d. LEED certification <br /> e. Project management & other soft costs <br /> f. Moving/relocation costs <br /> g. Financing costs <br /> h. On-going O&M costs <br /> i. Others? <br /> For the existing Fleet shop: <br /> a. The core building will get demolished <br /> b. Use the other two buildings for equipment storage <br /> c. Continue to use fueling bays <br /> Page 1 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.