New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Eugene Depot (4)
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
Eugene Depot (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2010 9:57:50 AM
Creation date
8/6/2008 9:49:20 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Engineering
PWA_Project_Area
Development
PW_Subject
Eugene Depot
Document_Date
9/26/2008
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Central Services <br /> Facility Management Division <br /> City of Eugene <br /> 210 Cheshire Avenue <br /> Eugene, Oregon 97401 <br /> (541) 682-2690 <br /> (541) 682-6242 FAX <br /> TRANSMITTAL <br /> Date: 3/14/03 <br /> Project: The Eugene Depot Rehab <br /> To: Scott Meisner, Kurt Corey <br /> . From: Russ Mecredy, 541-682-6024 <br /> Copies Description Date <br /> 1 ea Phase 1 site plan <br /> 1 ea plans showing increments of improvements to phase 1 state <br /> 1 ea Draft Master Plan <br /> 1 <br /> Scott, <br /> We have changed our Phase 1 arrangement in some places so I'm also including sketches showing a <br /> sequence of steps likely for improvements up to the current Phase 1 plan. At this time the improvements <br /> in Oak St. might need to be paint markings and a curb cut but we would still get the benefit of a vehicular <br /> and pedestrian loop through the site. <br /> I am copying Kurt so you will have the same info and can discuss. If I-can help clarify please let me <br /> know. <br /> <br /> Russ M. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.