Q._...~ <br />How we applied LEED-EB <br />• Used prerequisites as a starting place and <br />guide <br />• We determined that we'd already met 2 of <br />them <br />• Assessed our O&M procedures against the <br />remaining 10 prerequisites. <br /> <br />Phases of Implementation <br />Phase 1: <br />Assess current operations against LEED-E6 prerequisites <br />' Phase 2: <br />Implement all prerequisites appropriate on organization- <br />wide basis <br />Phase 3: <br />Assess organization-wide credits already being <br />implemented and implement those near to meeting <br />LEED-EB <br />Prerequisite Level of Assessment <br />Sustainable Sites GYganimfion-wide <br />Erosion contrd Plan <br />Water #1 Building Specific <br />90'/ meet EPACT 1982 fiMure per/armence requvements <br />Water#2 Building Specific <br />Fellow EPA NPDES Adrequlrements, use oil and grease sepa~das <br />Enerav #1 Building Speci6e <br />Comprehensive retra-canMsstoning <br />Enerw ft2 Building Specific <br />Minimum building efficiency <br />Enerav #3 CYganiraM1On•wide <br />Ozone depletion <br />tAafa[iali pganizafon wide <br />Establish recycling program <br />J~1[t Building Specific <br />Minimum IAO perlarmance <br />IEa M2 Q-ganization wide <br />Tobacco Smolre <br />IEO #3 Organization wide <br />Asbestos <br /> <br />~' <br />. Linear process became multi-layered <br />- staff enthusiasm pushed us to exparid <br />3 <br />