<br /> DISCUSSION DRAFT -FOR THE PURPOSES OF INITIAL DISCUSSION, NOT <br /> PROPOSED FOR ACCEPTANCE <br /> agreement, will include all pipes, pumps, pumping stations and treatment facilities located along <br /> the route thaC Coburg wastewater will needto travel to get :from the point of connection to the <br /> MWMC treatment facility.. <br /> Point of connection. The location point of which the Coburg system connects to the MWMC <br /> system, to be established by technical staff of Coburg, Eugene and MWMC. For purposes of this <br /> agreement and later analysis, the point of connection and downflow from the point of connection <br /> shall be considered a part of the regional system. <br /> I <br /> l <br /> I <br /> i <br /> DRAFT - IGA for Coburg - MWMC DRAFT. Page 9 i. <br /> 3-10 <br /> <br />